This is a photo record of the progress on my - to be - new abode, currently under construction

 

 

 

 

This period saw the installation of the septic system involving digging enormous holes in the ground for the tank and for the drainage pits, dropping the tank in then the drainage pipes then backfilling. A few hours of dust and noise, but good to get a good day for it and get it over and done with. Of course the back fill sunk gradually over time and we left it until October to get a bobcat back to build up the ground and level it and the half filled water and electricity mains trenches off so we could actually safely walk around the front yard.

Inside, the kitchen cabinets and benchtops arrived and they were assembled and installed, and fitted with kitchen sink and cook top.

Other work included fitting the 10 windows and sliding glass door and installation of wall linings. A start was made on polyurethaning and fitting of trim timber, architraves and skirtings around doors and windows

from 19th Feb 2014
to 21st April 2014

Mar-13

Apr-13

May-13

Jun-13

Jul-13

Aug-13

Sep-13

Oct-13

Nov-13

Dec-13

Jan-14

Feb-14

Mar-14

Apr-14

May-14

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

home